top of page
Monte Redondo Race Resort
Client
Epinephrine Capital
Year
2023
Location
Coimbra, Portugal
Share
Project Website:
SOLAPAVE and Epinephrine are creating a European hub for Electric Vehicle development and enjoyment, consisting of not one, but 2 race tracks; a 5.6Km gp circuit and a 2.5Km Solapave track, focused on EV innovation.
This development will be at the forefront of new EV design philosophies, helping in reducing battery size and increasing electric vehicle capability alongside OEM vehicle manufacturers.

Performance Testing
22KW/hr Dynamic Recharge
Vehicle Development
Autonomous Systems
Energy Generated /day:
17,500+KWhrs
Lifetime Carbon saving:
89M Tonnes

bottom of page